Plumbing Rough-in
May 3, 2003: Water supply and DWV under master bathroom being installed.
![]() |
![]() |
![]() |
|||
Water shut-off to outside faucet. | Water supply lines under master bathroom. | ||
![]() |
|||
Water supply lines under
main bathroom (seen from Mudroom). |
Water supply for
refrigerator and Powder room toilet with water hammer arrester. |
May 24, 2003: Plumbing rough-in nearing completion.
![]() |
![]() |
||
![]() |
![]() |
Jun 18, 2003: With rough-in inspection coplete, waste stacks are connected to drains.
![]() |
|||
Front stack: serving master bath and front bedroom. |
Rear stack: serving main bathroom, laundry, kitchen, and rear bedroom. |