Kitchen - Fixtures and Finishes
November 8, 2003: Initial work after ceiling drywall was hung.
![]() |
![]() |
||
Making connections. | Oven installed. |
November 20, 2003: Dishwasher drain hose installed.
![]() |
|
December 28, 2003: Refrigerator moved into place.
![]() |
![]() |
||
Removing doors. | |||
![]() |
![]() |
||
Moving into place. |