Insulation and Vapour Barrier
June 21, 2003: Day one of the insulation blitz.
![]() |
![]() |
||
Office/spare bedroom. | Front bedroom - waiting instructions. | Front bedroom - still waiting instructions. | |
![]() |
![]() |
||
Front bedroom. | Front bedroom - following instructions. | Ready to insulate the family room. | |
![]() |
![]() |
||
Bath tub area of main bathroom. | Bath tub area of main bathroom. | Bath tub area of main bathroom. | |
![]() |
![]() |
||
Bath tub area of main bathroom. | North wall of dining room. | North wall of dining room. | |
![]() |
![]() |
||
North wall of dining room. | North wall of dining room. | North wall of dining room. | |
![]() |
![]() |
||
North wall of dining room. | North wall of dining room. | Insulating water pipes in kitchen. |
June 22, 2003: Second floor insulation completed; first floor nearly half done.
![]() |
![]() |
||
North wall of master bedroom. | South wall of front bedroom at closet. | South-east corner of rear bedroom. |
July 1, 2003: Vapour barrier in second floor being installed.
![]() |
||
Attaching ceiling vapour barrier in hall closet. | Vapour barrier in master bath shower. | |
![]() |
![]() |
|
More vapour barrier. | Cleaning up at end of day. |
July 13, 2003: First floor insulation nearly completed; insulation above garage underway.
![]() |
![]() |
||
HVAC duct through garage boxed in for insulating. |
Installing vapour barrier above garage ceiling. | Front bedroom vaulted ceiling being insulated. |
July 20, 2003: Vapour barrier work.
![]() |
![]() |
||
Taping vapour barrier seam. | Front bedroom. | Some rigid foam insulation in front bedroom. | |
![]() |
![]() |
||
![]() |
![]() |
||
Fixing some blocking in
front bedroom (working from balcony!). |
View looking up in front bedroom. | ||
![]() |
![]() |
||
Cleaning some of the dust in the front bedroom. | More cleaning. | Still more cleaning. | |
![]() |
![]() |
||
Installing vapour barrier
in master bedroom closet. |
Installing vapour barrier in master bedroom closet. |