Grading
May 31, 2003: Rough grading and preparing garage for concrete floor.
![]() |
|||
Moving soil in back yard. | Remaining excavation soil moved. | ||
![]() |
|||
Back yard relatively level (with slight slope). | Parked for the night in the garage. |
June 1, 2003: Spreading stone in garage and levelling ground at front of house.
![]() |
![]() |
||
![]() |
![]() |
![]() |
|
![]() |