Preliminary Work, Ground Breaking and Excavation
June 3, 2002: power was connected to the temporary electrical service.
![]() |
![]() |
August 7, 2002: town brought the services (water, sanitary sewer, and storm sewer) to the lot line.
![]() |
![]() View from just north of lot looking south.. |
![]() |
![]() |
August 10, 2002: ground breaking day!
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
The first bucket in the ground. | Dropping the first bucket. | |
![]() |
![]() |
![]() |
View of excavation from atop the "mountain". | View from the front of the excavation. |
Excavation was competed August 12, 2002- these photos were taken the morning of the 14th.
![]() |
|
View looking from back of lot. | View from north side at front of lot. |