Deck and Landscaping
April 9, 2004: Framing begins.
![]() |
![]() |
||
Beam installation. | |||
![]() |
|||
![]() |
![]() |
![]() |
|
April 24, 2004: Decking underway - south retaining wall completed.
![]() |
![]() |
||
Final digging and adjusting for south retaining wall. | |||
![]() |
|||
Trex™ decking being installed. |
![]() |
|||
Preparing a vegetable garden. | |||
![]() |
|||
June 3, 2004: Final grading and sod.
![]() |
![]() |
||
Clearing and leveling. | |||
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
Gravel arrives. | Sod arrives. | ||
![]() |
![]() |
![]() |
|
Backyard graded. | North side of house. | ||
![]() |
![]() |
![]() |
|
Front lawn. | |||
![]() |
![]() |
![]() |
|
Back yard. | South side of house. | ||
![]() |
![]() |
||
South side of driveway. | The crew. |
August 27, 2004: Sidewalk and driveway curbs.
![]() |
![]() |
||
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
October 4, 2004: Deck railings installed by CPL.
![]() |
![]() |
||