Plumbing Rough-in

May 3, 2003: Water supply and DWV under master bathroom being installed.

 

May 19, 2003: Supply lines.

Water shut-off to outside faucet. Water supply lines under master bathroom.

Water supply lines under main bathroom
(seen from Mudroom).
Water supply for refrigerator and Powder room
toilet with water hammer arrester.

 

May 24, 2003: Plumbing rough-in nearing completion.

 

Jun 18, 2003: With rough-in inspection coplete, waste stacks are connected to drains.

Front stack:
serving master bath and front bedroom.
Rear stack:
serving main bathroom, laundry,
kitchen, and rear bedroom.

 

 

return to last page