Kitchen - Fixtures and Finishes
November 8, 2003: Initial work after ceiling drywall was hung.
Making connections. | Oven installed. |
November 20, 2003: Dishwasher drain hose installed.
December 28, 2003: Refrigerator moved into place.
Removing doors. | |||
Moving into place. |