Drywall

August 23, 2003: Powder Room.

     

 

August 24, 2003: Front Bedroom.

South wall.

South wall. West wall.

West wall
Measuring west wall. Cutting piece at closet door.
North wall. View from hallway. View from west wall.

 

August 25, 2003: More drywall.

Powder room. Garage.

 

August 30, 2003: Drywall continues.

Concrete board around bathtub of main bathroom being installed.

 

September 6 & 7, 2003: Garage and first floor ceilings.

  Walls outside front bedroom.

 

September 13, 2003: Completing second floor walls.

Help from Ken. Measuring.
More measuring. "Here's Johnny!"

 

September 20, 2003: First floor drywall.

Cutting for an outlet.

 

Kitchen completed.

Family room half-wall. Beam at bottom of stairs.

Beam at bottom of stairs.

Taping and mud in kitchen area.

     

     

 

September 24, 2003: Finishing kitchen drywall.

Wall outside pantry (separating kitchen from hallway).

Wall outside pantry.

 

September 25, 2003: Finishing master bathroom.

Shower stall. South-west corner. Tub area.

 

 

September 27, 2003: First floor drywall.

Mudroom drywall.

     
  Removing styrofoam from bottom of wall. Looking into alarm system.

Taping and mud in kitchen area.

     

     

 

September 28, 2003: Completing second floor walls.

 

 

 