Drywall
August 24, 2003: Front Bedroom.
South wall. | |||
South wall. | West wall. | ||
West wall | |||
Measuring west wall. | Cutting piece at closet door. | ||
North wall. | View from hallway. | View from west wall. |
August 25, 2003: More drywall.
Powder room. | Garage. |
August 30, 2003: Drywall continues.
Concrete board around bathtub of main bathroom being installed. |
September 6 & 7, 2003: Garage and first floor ceilings.
Walls outside front bedroom. |
September 13, 2003: Completing second floor walls.
Help from Ken. | Measuring. | ||
More measuring. | "Here's Johnny!" |
September 20, 2003: First floor drywall.
Cutting for an outlet. |
|||
Kitchen completed. |
Family room half-wall. | Beam at bottom of stairs. | |
Beam at bottom of stairs. |
|||
Taping and mud in kitchen area. |
|||
September 24, 2003: Finishing kitchen drywall.
Wall outside pantry (separating kitchen from hallway). | |||
Wall outside pantry. | |||
September 25, 2003: Finishing master bathroom.
Shower stall. | South-west corner. | Tub area. | |
September 27, 2003: First floor drywall.
Mudroom drywall. |
|||
Removing styrofoam from bottom of wall. | Looking into alarm system. | ||
Taping and mud in kitchen area. |
|||
September 28, 2003: Completing second floor walls.