Drywall
|
![]() |
![]() |
|
|
![]() |
||
August 24, 2003: Front Bedroom.
|
![]() |
![]() |
|
| South wall. | |||
|
![]() |
![]() |
|
| South wall. | West wall. | ||
|
![]() |
||
| West wall | |||
![]() |
![]() |
||
| Measuring west wall. | Cutting piece at closet door. | ||
![]() |
![]() |
![]() |
|
| North wall. | View from hallway. | View from west wall. | |
August 25, 2003: More drywall.
|
![]() |
![]() |
|
| Powder room. | Garage. | ||
August 30, 2003: Drywall continues.
|
![]() |
![]() |
|
| Concrete board around bathtub of main bathroom being installed. | |||
September 6 & 7, 2003: Garage and first floor ceilings.
|
![]() |
![]() |
|
| Walls outside front bedroom. | |||
September 13, 2003: Completing second floor walls.
![]() |
![]() |
||
| Help from Ken. | Measuring. | ||
![]() |
![]() |
||
| More measuring. | "Here's Johnny!" |
September 20, 2003: First floor drywall.
|
|
|
|
Cutting for an outlet. |
|||
|
|
|
|
Kitchen completed. |
Family room half-wall. | Beam at bottom of stairs. | |
![]() |
![]() |
![]() |
|
Beam at bottom of stairs. |
|||
|
|
|
|
Taping and mud in kitchen area. |
|||
|
|
|
|
|
|
|
|
|
|
|
|
September 24, 2003: Finishing kitchen drywall.
|
![]() |
![]() |
|
| Wall outside pantry (separating kitchen from hallway). | |||
|
![]() |
||
| Wall outside pantry. | |||
![]() |
![]() |
||
September 25, 2003: Finishing master bathroom.
|
![]() |
![]() |
|
| Shower stall. | South-west corner. | Tub area. | |
|
![]() |
||
September 27, 2003: First floor drywall.
|
|
|
|
Mudroom drywall. |
|||
|
|
|
|
![]() |
![]() |
![]() |
|
| Removing styrofoam from bottom of wall. | Looking into alarm system. | ||
|
|
|
|
Taping and mud in kitchen area. |
|||
|
|
|
|
|
|
|
|
September 28, 2003: Completing second floor walls.
![]() |
|