Drain and Concrete Work
April 8, 2003: Drain & Concrete contractor on site to attach sewer lines and lay drains in basement.
|
![]() |
![]() |
||
| Slinging extra stone into basement. | View from garage. | View from balcony. | ||
|
![]() |
![]() |
||
| View from sitting room. | Stone slung into basement. | Drain to stack for main bathroom and kitchen. | ||
|
![]() |
![]() |
||
| Furnace room floor drain (green),
stack for master bathroom (black) and water service. |
Back-filling. | |||
![]() |
||||
April 9, 2003: Basement floor is poured.
|
![]() |
![]() |
|||
| Stone leveled before the pour. | |||||
|
![]() |
![]() |
|||
| Heater hung from ceiling. | Chute for concrete in place. | Concrete arrives. | |||
|
![]() |
![]() |
|||
| Screeding the concrete. | |||||
![]() |
![]() |
||||
July 3, 2003: Porch and garage floor poured.
|
![]() |
![]() |
||
|
![]() |
![]() |
||
|
![]() |
![]() |
||
| Pad for air conditioner. | Posts for deck. | Pad for generator. | ||