Deck and Landscaping
April 9, 2004: Framing begins.
|
![]() |
![]() |
|
| Beam installation. | |||
|
![]() |
||
![]() |
![]() |
![]() |
|
April 24, 2004: Decking underway - south retaining wall completed.
|
![]() |
![]() |
|
| Final digging and adjusting for south retaining wall. | |||
|
![]() |
||
| Trex™ decking being installed. | |||
|
![]() |
||
| Preparing a vegetable garden. | |||
|
![]() |
||
June 3, 2004: Final grading and sod.
|
![]() |
![]() |
|
| Clearing and leveling. | |||
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
| Gravel arrives. | Sod arrives. | ||
![]() |
![]() |
![]() |
|
| Backyard graded. | North side of house. | ||
![]() |
![]() |
![]() |
|
| Front lawn. | |||
![]() |
![]() |
![]() |
|
| Back yard. | South side of house. | ||
![]() |
![]() |
||
| South side of driveway. | The crew. | ||
August 27, 2004: Sidewalk and driveway curbs.
|
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
![]() |
![]() |
![]() |
|
October 4, 2004: Deck railings installed by CPL.
|
![]() |
![]() |
|