Deck and Landscaping
April 9, 2004: Framing begins.
Beam installation. | |||
April 24, 2004: Decking underway - south retaining wall completed.
Final digging and adjusting for south retaining wall. | |||
Trex™ decking being installed. |
Preparing a vegetable garden. | |||
June 3, 2004: Final grading and sod.
Clearing and leveling. | |||
Gravel arrives. | Sod arrives. | ||
Backyard graded. | North side of house. | ||
Front lawn. | |||
Back yard. | South side of house. | ||
South side of driveway. | The crew. |
August 27, 2004: Sidewalk and driveway curbs.
October 4, 2004: Deck railings installed by CPL.