Bathrooms - Fixtures and Finishes

August 11, 2003: Initial work after ceiling drywall was hung.

Main bathroom tub installed and leak tested. Master bathroom shower has sloping mud base.

 

October 22, 2003: Main bathroom toilet installed.

Opening flange. Levelling bowl. Caulking around base of bowl..
First flush! Flapperless design. Testing the seat.

 

November 8, 2003: Master Bathroom fixtures installed.

Toilet and bidet ready for use.

 

 

return to last page